Hello, this week my family and I did the lock down epro 8 challenge. The only two resources we were aloud to use was sellotape and paper. The reason why it is called a Baked Bean bridge is because once you finish building your bridge you put a Baked bean can on your bridge and see if it holds the weight. We decided to build our bridge 3.28 metres long. Here are some photos of it finished. We used a triangle strategy.

